Metso to deliver defibrator system to Indonesia
The delivery from Metso will include all main machinery of the EVO 56 Defibrator system, related motors, a control system as well as supervision of installation and start-up.PT Sumatera Prima Fibreboard’s new thin board line will be located adjacent to an existing plant in Palembang, South Sumatra, Indonesia. The production will cover board thicknesses in the range of 1.5 mm up to 12 mm with a maximum defibrator capacity of about 30 dry tons per hour. Raw material will be mainly acacia and rubber wood.PT Sumatera Prima Fibreboard will become the largest producer of MDF in Indonesia once the new line comes on stream. The EVO 56 system is the first Defibrator system from Metso to the company.The Siempelkamp Group is an international supplier of equipment to industry in the mechanical and plant engineering markets.